Beam Vessel (ITER NBTF)

Engineering support and beam source installation inside the Beam Vessel (ITER NBTF)

Case Histories / Beam Vessel (ITER NBTF)
Return to all case histories

Engineering support and beam source installation inside the Beam Vessel (ITER NBTF)

Within the MITICA project at the ITER Neutral Beam Test Facility (NBTF) at Consorzio RFX in Padua, following the delivery and acceptance testing of the beam source and calorimeter, the facility is transitioning toward final assembly and integration inside the Beam Vessel (BV).

Under the contract signed with Consorzio RFX on July 31, 2025, Synecom was appointed to:

  • prepare all technical and project documentation required for the Installation Readiness Review (IRR) with Fusion for Energy (F4E);
  • execute the physical mechanical installation of the beam source inside the Beam Vessel (BV).
  • Challenge: Ensuring rigorous procedural quality to pass F4E’s demanding IRR qualification while preparing the physical positioning of the beam source within tight mechanical and vacuum tolerances.
  • Solution: Synecom deployed a dedicated engineering team working in daily synergy with RFX for over a year to co-engineer technical dossiers, leveraging previous hands-on experience gained during the successful assembly, installation, and testing of power supply components for JAEA/QST and Hitachi.
  • Contract & Progress: Contract awarded on July 31, 2025; over a year of successful co-engineering and documentation preparation completed ahead of the upcoming IRR review.
  • Track Record Expansion: Further solidifies Synecom’s position as a trusted engineering and installation contractor for complex experimental fusion infrastructures.

External Reference:

Background news regarding the delivery, site acceptance testing, and facility milestones of the MITICA project was published by ITER:

MITICA testbed: final installation scheduled to begin — Read the official update on ITER.org

Facility context and image credits: ITER Organization / Consorzio RFX.